Our New Build Project 2004 -2005 The photos below tell the story of the build.
The two outside hutted classrooms as they were July 2004
The old outside toilet block (which had been used in recent times as storage) was demolished. The children lose most of their playground to make way for the builders
roadway.
Sadly the large conifer has to be cut down.
The play equipment and cherry tree have to be removed to make way for the new wing.
The play equipment will be relocated around the field.
A fence was erected to screen the site from the playground.
The site was cleared and prepared for building to start.
The children loved to watch what was going on.
The new building starts to emerge.
Scaffolding is put up as the building starts to grow.
During the summer holidays the Pandas (Reception Class) were moved into
the hall.
This is how the area looked outside before the connecting corridor work was started.
The foundations for the new corridor are put in. Breaking through to the existing school took place during the Christmas holidays.
The end wall for the Pandas cloakroom is knocked through to form part of the new connecting corridor.
Inside the new classrooms (left) and staffroom (complete with under floor heating) begin to take shape.
Picture 1 - Looking into the new building corridor (the Millennium
Courtyard is immediately to the left in this picture.)
Inside one of the new classrooms. Work is progressing very quickly now. The following pictures were taken during the Easter holidays.
Picture 1 Picture 2 Picture 1 shows the view looking into the new corridor towards the
Dolphins classroom from outside the school office. The new pink staffroom.
Pandas new classroom Pandas new cloakroom
Picture 1 Picture 2 Picture 1 the new classroom are to the right in this picture. Picture 2 Looking back towards the school office. The new wing The fencing is being removed ready for the start of the summer term. From the field, still some work to do outside. The new path around the field can be used all year. The men our replacing the play equipment and installing a new piece. The view along the bottom of the field. Looking back towards the new wing, it's already blending in nicely. The view back towards the site for the new play equipment. Looking back towards the maze. The new path runs all around the field. The new wing, the Polar Bears classroom is on the right. The end of the Pandas classroom. Work has begun on the old Air Raid Shelter which is being converted into storage and changing facilities. The Pandas in their new classroom The Pandas cloakroom |